24 mai 2011 - No Lack of Attention given to Sarlat

MARDI
Time for new plants at the roundabout. 

Zooming in just beyond the roundabout, they are digging up the roadside to lay wires.
The direction of traffic is alternated, because along one lane along Avenue du Lot is open while they dig holes along the side of the road.
The digging continues along Avenue de la Canéda.
It is just after ten in the evening and it is still dusk. The square is rather lively with tourists. It feels like summer with the temperature in the 70s.